Enter a kVA, kW or amp value, pick the system, and get the other two. Three-phase current is kVA × 1000 ÷ (√3 × line voltage); single-phase current is kVA × 1000 ÷ voltage. kW is kVA × power factor.
Full-load current of common transformer sizes
Rated secondary current, calculated from the nameplate kVA. These are not conductor or breaker sizes.
| 3-phase kVA | 208 V | 480 V | 600 V |
|---|---|---|---|
| 15 | 41.6 A | 18.0 A | 14.4 A |
| 30 | 83.3 A | 36.1 A | 28.9 A |
| 45 | 124.9 A | 54.1 A | 43.3 A |
| 75 | 208.2 A | 90.2 A | 72.2 A |
| 112.5 | 312.3 A | 135.3 A | 108.3 A |
| 150 | 416.4 A | 180.4 A | 144.3 A |
| 225 | 624.5 A | 270.6 A | 216.5 A |
| 300 | 832.7 A | 360.8 A | 288.7 A |
| 500 | 1,387.9 A | 601.4 A | 481.1 A |
| 1-phase kVA | 120 V | 240 V |
|---|---|---|
| 10 | 83.3 A | 41.7 A |
| 15 | 125.0 A | 62.5 A |
| 25 | 208.3 A | 104.2 A |
| 37.5 | 312.5 A | 156.3 A |
| 50 | 416.7 A | 208.3 A |
| 75 | 625.0 A | 312.5 A |
| 100 | 833.3 A | 416.7 A |
| 167 | 1,391.7 A | 695.8 A |
What this number is, and what it is not
The result is the full-load current a load or transformer draws at its rating. Sizing the conductors, overcurrent protection and service for that load is a separate step: the Canadian Electrical Code (CEC 2024) applies demand factors, continuous-load limits, ambient and bundling corrections and voltage-drop checks, and the utility has its own service requirements. For a permit submission in Alberta that work is done and sealed by an engineer.